
Alatas Marine Electronics can carry out pre
dry dock inspections of all the Communication and Navigation equipment.
|
Detailed reports and recommendations can be drawn
up prior to the ship dry docking |
|
Command and supervise all dry dock installation work. |
|
Carry out annual inspections of all bridge equipment using
correct test equipment with regular and comprehensive reports. |
|
Carry out major electronic and electrical installation/repairs such as cable replacement and connections in engine rooms, pump rooms and on deck |
Alatas Marine Electronics can provide turnkey project
management for design, installation and commissioning of navigation,
communicationand entertainment systems onboard any type of vessel
or offshore facility.
One recently completed turnkey projects;
| November 2007 |
American Progress |
Gdansk, Poland |
| September 2007 |
Wilmington |
JSL, Singapore |
| May 2007 |
Baytown |
JSL Singapore |
| November 2006 |
Stolt Hawk |
En passage |
|
|


Alatas Marine Electronics can supply the statutory
radio surveyor's but also supply surveyor's to carry out complex
electronic equipment surveys. This involving such items as radar
antennas and displays, Echosounder/Speed Log Transducers and Gyro
overhauls. Detailed performance reports on the condition of equipment
including test results can be regularly recorded.


Turnkey project management can be provided by Alatas Marine Electronics. Design, Installation and commissioning of communication equipment as well as electrical installations such as tank gauging systems or overhaul of deck equipment including cargo control room systems.

|